100 Madision

400,000 SF 18 story office complex built between the Ohio River and the Northern Kentucky Convention Center.

  • Location: Covington, Kentucky
  • Completed: 2000
100 Madision
11 June, 6:05pm
11 images in album

Amylin

Amylin is 350,000 sf structural steel, multi- story building as well as several additions and modifications to first phase of the pharmaceutical companies ambitious development.

  • Location: Hamilton, Ohio
  • Completed May 2008
Amylin
14 February, 3:06pm
15 images in album

Bridgewater Falls

Outlot and Phase V buildings are the most recent of 11 retail buildings J & B Steel has erected at the Bridgewater Falls Retail Complex in Hamilton, Ohio. A total of 30-40 storefronts will make up approximately 630,000 SF of upscale retail space. Over the past three years, J & B Steel has erected approximately 250,000 SF of the complex, each an individual bar joist and roof deck project.

  • Location: Hamilton, Ohio
  • Completed: April 2007
Bridgewater Falls
11 June, 5:35pm
17 images in album

Columbia Sussex

 

This office building is a 10 story, 120,000 SF building with cantilevered roof systems on all four sides.

  • Location: Crescent Hills, Kentucky
  • Completed: July 2007

 

 

Columbia Sussex
11 June, 5:44pm
21 images in album

Columbus Airport Taxiway

Furnished and installed over 4.4 million pounds of reinforcing steel for the Columbus Regional Airport Authority's airport expansion project. Our ironworkers also installed approximately 615,000 pounds of multi-strand post tensioning cables in the bridges. This work included 3 new bridge structures: Crossover Taxiway, Perimeter Road, Loop Road Bridges and a Pump Station with Stormwater Vault structures.

  • Location: Columbus, Ohio
  • Completed: September 2007
Columbus Airport Taxiway
11 June, 4:35pm
19 images in album

Ft. Washington Way

J & B Steel installed over 5,000 tons of reinforcing steel, 1,500,000 pounds of multi-strand post tensioning and over 100 truck loads of pre-cast. Our team of 75 union ironworkers worked two shifts, 7 days a week for over 15 weeks to keep the project on schedule.

  • Location: Cincinnati, Ohio
  • Completed: 2001
Ft. Washington Way
11 June, 6:43pm
27 images in album

Grand Ridge Wind Farm

 

Just over 3,750,000 lbs of rebar in 66 Wind Turbine foundations were installed. Each octagon shaped foundation included a bottom mat, top mat, and column pedestal.

  • Location: Ransom, Illinois
  • Completed: March 2008
      Grand Ridge Wind Farm
      18 September, 2:48pm
      7 images in album

      Greenville Ethanol Plant

      110,000,000 Gallons of ethanol per year will be produced at this single plant. J & B Steel maintained a demanding schedule while extensively coordinating with other trades on site. J & B Steel installed all the structural steel, stairs, railings and platforms on the job. We also rigged and set all of the large vessels on site.

      • Location: Greenville, Ohio
      • Completed: February 2008
      Greenville Ethanol Plant
      16 July, 8:12am
      7 images in album

      Heritage Hill Elementary School

      Elementary school is a 63,000 SF masonry bearing school built as part of the Princeton City Schools Master Plan.

      • Location: Cincinnati, Ohio
      • Completed: September 2007
      Heritage Hill Elementary School
      12 July, 3:32pm
      8 images in album

      Main Street Bridge

      Furnish and install reinforcing steel for the Ohio Department of Transportation's replacement of the Main Street Bridge in Columbus, OH. This 700 long structure over the Scioto River will serve as a key element to the revitalization of the Columbus Civic Center because it features both a roadway deck, and a pedestrian bridge.

      • Location: Columbus, Ohio
      • Completed: In Progress
      Main Street Bridge
      11 June, 4:51pm
      26 images in album

      ODOT 036 - I-35 Dayton, Ohio

      Project involved improvement of 27 structures along a 3.5 mile stretch of US Route 35 in Dayton, OH. We supplied and installed over 2.1 million pounds of rebar over the various structures where we replaced the abutments / wingwalls, parapets, approach slabs, and some of the bridge decks.

      Location: Dayton, Ohio

      Completed: September 2007

      ODOT 036 - I-35 Dayton, Ohio
      27 February, 2:04pm
      10 images in album

      ODOT 414 - I-275

      Supplied and Installed approx. 8,200,000 LBS of rebar and over 25,000 mechanical connectors on ODOT Project 414 (06) – the I-275 Major Reconstruction project. Our work included rebar and mechanical connectors for 27 Bridge structures with approach slabs, Noise wall cages, Retaining walls, Single slope barriers, Inlet tops, and Miscellaneous site culverts.

       

      Location: Hamilton County, Ohio

      Completed: 2009

      ODOT 414 - I-275
      28 January, 3:30pm
      17 images in album

      Reid Hospital

      Approximately 5,000 ton, 530,000 SF, 7 story hospital tower addition.

      • Location: Richmond, Indiana
      • Completed: 2006
      Reid Hospital
      12 July, 3:27pm
      18 images in album

      Our Core Purpose is to enhance the quality of life by safely building structures with innovative, educated, professional teams.

       

       

       

      J & B Steel continually strives to support our clients by contributing our expertise to their plan at each unique stage of a project and becoming part of their construction team.

       

       

      Please browse our project portfolio!

       

      We are working to be the BEST steel erector & resteel installer from sea to shining sea.